Stand decoration
Eyecatchers & upgrades
- Easy Eye Catchers
- Easy Excellent packages
- Prints
- Furniture
- Greenery decoration
- Raised floors and various colours and types of flooring
- Upgrade packages
Corner stand
Intermediate stand
Headstand
Island stand
Technical provisions
Electricity
- For machines with a frequency controller, an electrical connection for machines must be requested via the webshop.
- Electrical connections are switched off after the event closes. If machines require electricity 24 hours a day, please request night power via the webshop.
Water
- The water temperature must be kept below 25°C or above 50°C. Measure the temperature every two hours and keep a logbook of this.
- Water pipes and equipment that spray water must be regularly flushed, especially when not used for extended periods.
- Disinfect water installations with chlorine or other biocides.
- Document and record all activities and measures taken for legionella prevention.
Compressed air
From 13:00 on the last setup day until 1 hour after the closing time on the last day of the event.
Internet/WIfi
Rigging
Important update: roof rigging is no longer permitted in halls 1, 2, 3, 7 and Loods at Evenementenhal Hardenberg
Due to tightened safety regulations concerning the load-bearing structures of buildings with a public function, it is no longer allowed to attach materials to the roof structure in several of our halls. This applies to halls 1, 2, 3, 7 and Loods at Evenementenhal Hardenberg.
Building assessments now take a wider range of loads and external factors into account, including weather conditions such as snow and wind loads, as well as the combination of different types of load. As a result, the safety requirements for using roof structures have become more stringent. To ensure the safety of visitors, exhibitors and staff, no exceptions to this ban on roof rigging can be made in the halls listed above.
Hall 1: Roof rigging is no longer permitted
Hall 2: Roof rigging is no longer permitted
Hall 3: Roof rigging is no longer permitted
Halls 4, 5 and 6:
Maximum load per suspension point: 250 kg. A technical stand drawing showing the weight per suspension point must be sent to eventservices@easyfairs.com at least 30 days before the start of the event.
Hall 7: Roof rigging is no longer permitted
Loods: Roof rigging is no longer permitted
If your stand design includes a suspended structure, please contact your stand builder or Event Services (eventservices@easyfairs.com). We are happy to help you find safe alternatives, such as a free-standing truss structure or ground support.